Boland Kourdov

Your SUPER-powered WP Engine Blog

Updates to the town house – the first year

June 12, 2011 by sueboland

We are nearing a the end of our first year here in Arlington and I thought I would list what we updates we haev made to our move in ready condo

* Replaced the washer and dryer
* Repaced the dish washer
* Replaced the hot water heater
* Replaced and secured floor board in the attic
* Replaced and rebuilt the stairs in the basement
* Replaced and rebuilt the stairs to the basement from the outside
* Replaced the upstairs toliet
* Replaced the ceiling fan in
* Installed a timer in the bathroom for the fan
* Switched out the vanity installed double sink
* Replaced the medicine cabinate with a large mirror and wall scones
* Added closet maid organization to the hall, office, bathroom, and all the bedroom closets
* Replaced the shower head
* Replaced the shower rod
* Painted all the rooms in the first and second floors
* replaced the thermostat

Filed Under: house2home

Recent Posts

  • Hello world!
  • Vince has Strep Throat
  • Sometimes I have bad days
  • Nursery Take 2
  • Boy Names?

Archives

  • November 2017
  • September 2013
  • August 2013
  • July 2013
  • November 2012
  • December 2011
  • November 2011
  • October 2011
  • August 2011
  • June 2011
  • April 2011
  • May 2010
  • April 2010
  • March 2010

Categories

  • Abby
  • house2home
  • living with a baby
  • Maggie
  • Sue Interrupted
  • Things kids say
  • Uncategorized
  • web developer

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Copyright © 2022 · Beautiful Pro Theme on Genesis Framework · WordPress · Log in