We are nearing a the end of our first year here in Arlington and I thought I would list what we updates we haev made to our move in ready condo
* Replaced the washer and dryer
* Repaced the dish washer
* Replaced the hot water heater
* Replaced and secured floor board in the attic
* Replaced and rebuilt the stairs in the basement
* Replaced and rebuilt the stairs to the basement from the outside
* Replaced the upstairs toliet
* Replaced the ceiling fan in
* Installed a timer in the bathroom for the fan
* Switched out the vanity installed double sink
* Replaced the medicine cabinate with a large mirror and wall scones
* Added closet maid organization to the hall, office, bathroom, and all the bedroom closets
* Replaced the shower head
* Replaced the shower rod
* Painted all the rooms in the first and second floors
* replaced the thermostat